Chaos Communication Camp 2015: Difference between revisions
Line 96: | Line 96: | ||
Layout of FHB in coordination with others. | Layout of FHB in coordination with others. | ||
The layout proposal for fhb at CCC camp 2015 is based on our village at OHM 2013. So far just extra space for workshop area number two was added and area for tents. Note, the social area where we can gather, relax eat etc. is probably way to small for whole group and people involved, double size (extra two tables) should be considered. | The layout proposal for fhb at CCC camp 2015 is based on our village at OHM 2013. So far just extra space for workshop area number two was added and area for tents. Note, the social area where we can gather, relax eat etc. is probably way to small for whole group and people involved, double size (extra two tables) should be considered. Picture with dimensions of inner structures will be uploaded soon! | ||
<gallery widths=300x heights=300px perrow=3 caption="FHB village layout proposal 19/3/2015"> | <gallery widths=300x heights=300px perrow=3 caption="FHB village layout proposal 19/3/2015"> | ||
File:| | File:Fhb_CCC_camp_2015_proposal_faa18032015_bird.png| Bird view of possible fhb layout at CCC camp 2015. | ||
File:| | File:Fhb_CCC_camp_2015_proposal_faa18032015_front.png |Side view of the same. | ||
</gallery> | </gallery> | ||
Revision as of 11:18, 19 March 2015
Chaos Communication Camp 2015
Timeline
Field Day 1
Plans
crazy ideas
Users
who will participate? Sign up here! cccamp2015-users
Teams
we will some kind of communication structure - and this is chaotic.
Team Meta
Overall Overlady or Overlord (provisional) - OPEN
Secretary - OPEN
can answer phone calls, jabber, irc has the contact of all other ppl. if you don't know who to call call this person. Jabber: will be added Email: will be added DECT: will be added
Fundraiser - OPEN
- comes up with a plan how to raise funds.
Treasurer - OPEN
- the money person
- can money transfer quickly
- runs the bank account
- collects the bills
- does the budget
wiki master - OPEN
- Scheduling / Wiki - OPEN
- overviews and syncs the planning + documentation tools, ressources and deadlines
- "wiki master"
- wiki, pads
Team Food - OPEN
- Cooking equipment
- Food purchasing
- Food planning
Team Bar - OPEN
Team Transport - OPEN
- Truck rental
- Driving
- Loading/Unloading planning
- transport schedule
tour 1
camp
Team Infrastructure - OPEN
Layout of FHB in coordination with others.
The layout proposal for fhb at CCC camp 2015 is based on our village at OHM 2013. So far just extra space for workshop area number two was added and area for tents. Note, the social area where we can gather, relax eat etc. is probably way to small for whole group and people involved, double size (extra two tables) should be considered. Picture with dimensions of inner structures will be uploaded soon!
participate in field day, measures area and gets data for cad later
possible subtasks:
power
network
buildings (tents, dome)
Large group tents
needs to be rented and transported.
needs to be erected har har
Dome(s)
transport
buildup
Tables - ? (rent?)
Chairs - ? (rent?)
Lamps - ?
Team Content - OPEN
- the talk to person when you have content for FHB
- responseable for schedules of workshop areas
- workshop / talk area
Team Lights and Music - OPEN
- FHB signs
- sound
- lights
- decoration
- tv with food hacking videos