Here you can find info from sha2017 on the fly. | Here you can find info from sha2017 on the fly. | ||
===Day -1=== | |||
[[Image:Fhb_kitchensha2017_faa02082017.jpg|thumb|Progressing on the kitchen]] | |||
[[Image:Partysha2017 faa02082017.jpg|thumb|Enjoying the relaxation time.]] | |||
Greetings to all, | |||
today we started early and worked late. Experimental kitchen is nearly done concerning wood work, so is the experimental venue I. All the tents are up, we have running water set up (drinking water/waste water). We prepared different small dishes and enjoyed the evening and night together. | |||
Tomorrow we will do main ingredient shopping in the morning in "makro" and Asian shop, I hope also some bio shop. We need to finish main tent and test it - stoves, electricity, light set up, equipment etc. we will be preparing late dinner so lets enjoy it! | |||
I hope to meet tomorrow with most of you, we are nearly ready for the event. | |||
Sincerely from the ground, | |||
Frantisek | |||
===Day -2=== | |||
[[Image:Floor_in_kitchens_faa01082017.jpg|thumb|Floors in our kitchen.]] | |||
[[Image:Floor_in_kitchens_close_up_faa01082017.jpg|thumb|Kitchen floors close up.|]] | |||
Greetings to all, | |||
today we have made part of our floors and first table stove. Very importantly we sorted our connection to water and drainage for the event, event orga and camp workers helped us a lot, thanks to them all! | |||
We had also our first meal at fhb :-) and of course we have volunteered in the angel kitchen. | |||
Talk to you all soon, | |||
Sincerely, | |||
Frantisek | |||
===Day -3=== | ===Day -3=== |
Latest revision as of 22:39, 2 August 2017
Here you can find info from sha2017 on the fly.
Day -1
Greetings to all, today we started early and worked late. Experimental kitchen is nearly done concerning wood work, so is the experimental venue I. All the tents are up, we have running water set up (drinking water/waste water). We prepared different small dishes and enjoyed the evening and night together.
Tomorrow we will do main ingredient shopping in the morning in "makro" and Asian shop, I hope also some bio shop. We need to finish main tent and test it - stoves, electricity, light set up, equipment etc. we will be preparing late dinner so lets enjoy it!
I hope to meet tomorrow with most of you, we are nearly ready for the event.
Sincerely from the ground,
Frantisek
Day -2
Greetings to all, today we have made part of our floors and first table stove. Very importantly we sorted our connection to water and drainage for the event, event orga and camp workers helped us a lot, thanks to them all!
We had also our first meal at fhb :-) and of course we have volunteered in the angel kitchen.
Talk to you all soon,
Sincerely,
Frantisek
Day -3
Hi to all, today we have erected second tent, the new one which is fire proof and center of our activities. Bigmac has bought with Thorsten material for flooring. We have helped a bit preparing breakfast and lunch (and dinner) for volunteers. Also we have made our first workshop table.
It took time and effort but we are progressing. We need more hands on the ground as soon as possible and we have to prepare really well for tear down. We need to organize well and decide who is in charge of what and pull for one rope.
All the best to you,
Sincerely,
Frantisek
Day -4
Greetings to all, here you have some info from the day -5 and -4.
On Day -4 we have build up the first tent and moved all the stuff in - after they get totally wet first ... We have prepared tea eggs and kimchies (day -5 the later), had a great trip to the country side and swam naked. It was really nice camping day.