= May = | = May = | ||
* people should take up main roles for the CCC camp during May so we can set the orga and start to prepare effectively | |||
* we should preferably sort out our tent options till the end of May if possible, or at least secure some "minimal backup" solution if we decide to wait for some better deals | |||
* date and length of crowdsourcing campaign should be set, so should be the prelaminary budget | |||
= June = | = June = | ||
* by the end of the month would be good to run the crowdsourcing campaign so all the details should be already set by the beginning of the month working on the prepromotion. The campaign should not be not started later than beginning of July. | |||
* the workshop section should start to take shape | |||
* preferably all major projects should be discussed and decided on before the mid of June | |||
= July = | = July = | ||
* by mid of July we should have all planning as ready as possible and adjust later on just to what is necessary | |||
== 15 - food planning ready == | == 15 - food planning ready == | ||
* list of ingredients and necessary equipment to get for food and drink preparation needs to be done so it corresponds with the budget | |||
= August = | = August = | ||
* we need to know when is the campground open to us and who can be there first from fhb | |||
* I [User:Algoldor|Algoldor] would recommend to be at the ground latest for the build up by 6th of August, preferably before than | |||
== 1 - start buildup on site. first outpost. == | == 1 - start buildup on site. first outpost. == |
Latest revision as of 11:14, 4 May 2015
Dates:
March
21 Field Day 1
April
May
- people should take up main roles for the CCC camp during May so we can set the orga and start to prepare effectively
- we should preferably sort out our tent options till the end of May if possible, or at least secure some "minimal backup" solution if we decide to wait for some better deals
- date and length of crowdsourcing campaign should be set, so should be the prelaminary budget
June
- by the end of the month would be good to run the crowdsourcing campaign so all the details should be already set by the beginning of the month working on the prepromotion. The campaign should not be not started later than beginning of July.
- the workshop section should start to take shape
- preferably all major projects should be discussed and decided on before the mid of June
July
- by mid of July we should have all planning as ready as possible and adjust later on just to what is necessary
15 - food planning ready
- list of ingredients and necessary equipment to get for food and drink preparation needs to be done so it corresponds with the budget
August
- we need to know when is the campground open to us and who can be there first from fhb
- I [User:Algoldor|Algoldor] would recommend to be at the ground latest for the build up by 6th of August, preferably before than
1 - start buildup on site. first outpost.
5 - All large tents completed
Dome Kitchen Lounge (?)
7 - main arrival day 1
main infrastructure must be up.
12 - main arrival day 2
all infrastructure and projects must be up
13 - Camp First Day
17 - Camp Last Day
18 - shutdown
empty main infrastructure take down some tents return rented equipment prepare loading trucks
19 - shutdown
take down all tents but takedown tent take down dome load trucks
20 - take off
take down shutdown tent load trucks